摘 要:采用三维有限元法模拟某碾压混凝土拱坝的施工过程,进行了温控仿真计算,分析了该工程温度场和应力场的分布规律,提出了温控推荐方案。结果表明:采取初期、中期和后期冷却措施后,大坝的最高温度满足碾压混凝土坝设计规范要求,同时也满足封拱灌浆要求,最大温度应力小于混凝土的允许拉应力。It simulated a RCC arch dam construction process, conducted temperature control simulation, analyzed the distribution rule of the tem- perature field and stress field and put forward the recommended scheme of temperature by using three-dimensional finite element method. The re- suits indicate that after the initial, intermediate and late phases of cooling measures, the maximum temperature of the dam meets the RCC dam de- sign specification requirements, but also meet the closure grouting requirements; the maximum temperature stress is less than the allowable tensile stress of the concrete.
关 键 词:三维有限元法 施工过程 仿真计算 封拱灌浆 碾压混凝土拱坝
分 类 号:TV642.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.36.23