检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《国防交通工程与技术》2014年第1期74-77,共4页Traffic Engineering and Technology for National Defence
摘 要:双模式TBM是单护盾TBM与土压平衡EPB盾构机的优化组合,拥有针对不同围岩状态的两种掘进模式,对地质范围的适应性更大。在煤矿斜井深埋复杂地层条件下,由于地质因素、TBM掘进参数控制不当等原因,易导致围岩坍塌。对此提出在TBM掘进前、掘进过程中不同阶段防治坍塌控制方法,即采用超前地质预报、超前加固预处理和掘进参数监测与控制措施,有效防止了TBM围岩坍塌现象。Having two driving modes for different types of surrounding rock,the dual-mode TBM is the optimized combination of the single-shield TBM and the soil-pressure-balanced EPB shields, which is more widely appliable to various geological condi- tions of surrounding rock. As far as coal mine inclined shafts are concerned, which are located in deep-buried strata and geologi- cally complex, the collapse of the surrounding rock is often liable to happen due to the complex geological conditions and the im- proper control of the excavation parameters of the TBM,in which case some collapse-preventing measures before and during the different stages of the excavation of the TBM are presented in the paper, such as the adoption of the advanced geological fore- cast, the strengthening pre-treatment, the monitoring of the excavation parameters and other control measures, all of which help prevent the collapse of the surrounding rock during the excavation of the dual-mode TBM.
关 键 词:煤矿斜井 双模式TBM 围岩坍塌 软岩 掘进参数 超前地质预报 加固预处理
分 类 号:U455.31[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.48