检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁二院工程集团有限责任公司,四川成都610000
出 处:《铁路工程造价管理》2014年第1期1-5,共5页Railway Engineering Cost Management
摘 要:在西部山区峡谷地段修建铁路钢桁梁悬索桥,其结构形式和施工工艺复杂,编制概算没有针对性的铁路工程定额可采用。此文结合某山区铁路工程,以LX项目JSJ钢桁梁悬索桥为例,根据设计方案和具体工程内容及铁路工程定额,参考《城市轨道交通工程概算定额》和《公路工程预算定额》,就如何编制钢桁梁悬索桥工程概算进行探讨,并就根据补充的材料和定额以及可依据的相关工程定额,编制钢桁梁悬索桥工程概算的方法进行论述,为工程的顺利开展提供技术支持。in the western mountain canyon area to build a railway steel truss girder suspension bridge, the structure form and construction technology is complex, prepare budget without specific railway engineering quota can be used. Article combines a mountain railway project to LX project JSJ steel truss girder suspension bridge as an example, according to the design scheme and the specific content and railway engineering project quota, refer to the "urban rail transit project budget quota" and "highway project budget quota", how to prepare the steel truss girder suspension bridge engineering budget estimates are discussed, and according to the supplementary materials and norm, and can be based on relevant project quota, prepara- tion of steel truss girder suspension bridge, the essay discusses the method of engineering budget. Pro- vide technical support to the smooth development of engineering.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3