检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江水利委员会三峡水文水资源勘测局,湖北宜昌443000
出 处:《长江科学院院报》2014年第2期114-118,共5页Journal of Changjiang River Scientific Research Institute
摘 要:通过对三峡水库蓄水前后坝下游水沙条件代表站——宜昌水文站的资料进行统计,分析了三峡水库蓄水前后坝下游河道造床流量的变化,并结合水力学计算对水流挟沙能力进行估算,简要分析了坝下游河道水流挟沙能力沿程的变化情况。分析认为:三峡水库蓄水后引起的坝下游第一、第二造床流量变化和水流挟沙能力变化反映了坝下游河床以纵向冲刷为主的发展趋势;三峡蓄水前后同流量级条件下沿程水流挟沙能力的变化反映了三峡蓄水以来坝下游河段以中低水冲刷为主、中枯水位下降相对明显及河床沿程变化受节点控制的客观事实。We analyzed the variation of dominant discharge and sediment-carrying capacity of flow in the downstream of Three Gorges Reservoir before and after the reservoir impoundment.The analysis is mainly based on data observed from Yichang hydrological station,the representative station in the downstream of the dam.We found that the variations of the primary and secondary dominant discharges caused by water storage of the Reservoir as well as the variations of sediment carrying capacity revealed the trend of longitudinal erosion of the riverbed.Moreover,variation of sediment-carrying capacity before and after the impoundment in the presence of equal flow explained the facts of medium and low flow erosion,medium and low water level,as well as the riverbed variation controlled by nodes.
分 类 号:TV14[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7