旧采区复采采场围岩应力分布研究  被引量:2

Study on Stress Distribution of Surrounding Rock at Repeated Mining Stope of Residual Coal Area

在线阅读下载全文

作  者:刘畅[1] 李颂奇 樊秀志[2] 

机构地区:[1]太原理工大学矿业工程学院,山西太原030024 [2]煤炭工业太原设计研究院,山西太原030001

出  处:《金属矿山》2014年第1期29-33,共5页Metal Mine

基  金:"十二五"国家科技支撑计划项目(编号:2012BAB13B04);山西省青年科技研究基金项目(编号:2012021022-4)

摘  要:通过对望田煤业旧采区赋存结构的调研,总结了3种不同的旧采区顶板力学模型,对力学模型进行理论分析,得到顶板最大应力出现在靠近煤柱处。采用PFPA软件对旧采区复采过空巷、过煤柱时复采采场顶板和煤柱进行数值模拟,初步给出了过空巷、过煤柱时应通过注浆、充填、提前支护空巷控制顶板的技术措施。Through the investigation on existence structure of the residual coal area in Wangtian,3 kinds of roof me- chanical models for different residual coal area was established. The analysis on the mechanical models shows that the maxi- mum stress of the roof is nearby coal pillars. Numerical simulation on roof and coal pillar of the repeated mining stope across the gob and coal pillar in residual coal area was made with PFPA software. Such technical measures as grouting, filling, and forepoling to support the roof across the gob and coal pillar were initially proposed.

关 键 词:旧采区 复采采场 围岩应力 数值模拟 

分 类 号:TD822.2[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象