检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宿志一[1]
出 处:《电网技术》2001年第2期57-60,共4页Power System Technology
摘 要:长期以来 ,葛南直流换流站和线路在污闪季节处于 40 0k V以下运行 ,且运行时间仅 5 0 % ,但换流站直流设备闪络频繁 ,线路污闪行波保护动作率超过 0 .1/ (10 0 km.a)。这表明 ,国内还缺少直流外绝缘的设计经验。为此 ,强调葛南线进行冬季全压运行试验的必要性和紧迫性。Up to now although in the pollution flashover season the Ge Nan DC converter station and relevant transmission lines operate with the voltage less than 400 kV and the operation time is50%, however, thetripping rate of the transmission line is more than 0.1/100 km·year. This factindicates that the insulationdesigners in China are short of theexperiences indesigning the externalinsulationfor DC devices. Therefore, it is emphasized that to carry out the full voltage test of Ge Nan DC transmission line in winter is necessary and urgent.
分 类 号:TM853[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143