南京青奥中心超高层双塔全逆作地下室桩基设计  被引量:1

Pile foundation design of top-down construction basement of super high-rise twin towers of Nanjing Youth Olympic Center

在线阅读下载全文

作  者:董贺勋[1] 刘文珽[2] 任庆英[2] 张良平[1] 赵苏北 

机构地区:[1]华森建筑与工程设计顾问有限公司南京分公司,南京210005 [2]中国建筑设计研究院,北京100044

出  处:《建筑结构》2014年第1期58-60,87,共4页Building Structure

摘  要:南京青奥中心超高层双塔楼的3层地下室采用全逆作施工。采用大直径杯口形扩顶钻孔灌注桩实现了塔楼外框架钢管柱与桩基的可靠连接,保证了荷载的可靠传递,同时针对钢柱和工程桩提出了严格的垂直度和水平误差控制要求。由于超高层塔楼传给基础的荷载很大,C60超缓凝高强度混凝土和后注浆技术的采用有效地提高了工程桩的承载力,使工程桩能在满足逆作法施工阶段的承载力要求的同时又满足建成后承担全楼荷载的承载力要求。The top-down construction method was used in the three-storey basement of super high-rise twin towers of Nanjing Youth Olympic Center. To achieve the safe transfer of loads and reliable connection of the column and pile, the cup-shaped large-diameter bored piles were originally used in this project. At the same time, the requirements of verticality control and levelness control were strictly proposed for the steel column and the pile. For the huge gravity loads of the super high-rise building transferred to the foundation, C60 super retarding high strength Concrete and the post grouting technology were used. Bearing capacity of pile foundation was significantly improved by the above two methods, and the piles can meet the capacity of top-down construction stage and undertake all floors loads after the completion of the towers.

关 键 词:逆作法 大直径杯口形扩顶桩 C60超缓凝混凝土 后注浆技术 垂直度控制 

分 类 号:TU473.12[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象