检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水利水电第三工程局有限公司,西安710016 [2]中国水利水电建设工程咨询西北公司,西安712000
出 处:《中国水能及电气化》2014年第1期42-47,共6页China Water Power & Electrification
摘 要:丹江口大坝加高工程施工过程中,混凝土坝右联转弯坝段高程143m处理采取了锯缝方案。锯缝方案实施后,选择在右联1号、右1号和右2号坝段143m高程水平裂缝布设了监测设施,以进一步的观测锯缝方案的实施效果。本文介绍了监测设施的布置,并通过在大坝加高施工期的观测成果分析,对丹江口大坝右联转弯坝段143m高程水平裂缝处理效果作了监测评价。Abstract: Keff program was adopted in processing concrete dam right-connection turning-dam section elevation 143m in the construction process of Danjiangkou Dam Heightening Project. After the kerf program was implemented, monitoring facilities are distributed in horizontal cracks of 143m elevation in right-connection No. 1, right No. 1 and right No. 2 dam sections, thereby further observing the implementation effect of the kerf program. The layout of the monitoring facilities is introduced in the paper. The observation results in the dam heightening construction period are analyzed for monitoring analysis on treatment effect of Danjiangkou Dam Right-connection Turning-dam Section 143m Elevation Horizontal Crack.
分 类 号:TV544[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.102.140