检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:董斌
机构地区:[1]新疆塔河流域巴音郭楞管理局解放二渠管理站,新疆和静841300
出 处:《中国水能及电气化》2014年第1期48-49,47,共3页China Water Power & Electrification
摘 要:黄水沟分洪枢纽溢洪堰底栏栅消能曾采用硅粉混凝土和铺设橡胶的方式,但由于混凝土刚性材料与橡胶的连接及橡胶老化等原因,不能满足要求。后采用钢钻杆,按水流方向纵排列布置于底板之上来抗冲砸,因钢钻杆强度极高,但造价不高,与钢结构和混凝土连接牢固,对巨石冲砸起到了十分满意的效果。本文对此加以介绍。Abstract: Silica powder concrete and rubber laying mode were adopted in Huangshuigou Flood Diversion Hinge Spillway Weir Bottom Grid Energy Dissipation Project. However, the method can not meet the requirements due to connection between concrete rigid materials and rubber, rubber aging and other reasons. Steel drill rods were adopted, which are arranged vertically and transversely on the bottom board according to water flow direction for resisting crash. Steel drill rods can sufficiently resist crash of huge stone since they have extremely high strength, low cost and firm connection with steel structure and concrete. Concrete conditions will be introduced in the paper.
分 类 号:TV673[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7