检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邓昌宁[1]
出 处:《北方交通》2014年第1期19-22,共4页Northern Communications
摘 要:结合工程实例,通过对国内首座六跨中承式飘带形提篮拱桥进行静、动态有限元数值模拟,分析结构的受力特点,制定合理的静、动态试验研究方案,进行实桥荷载试验,研究桥梁实际受力状态与设计状态的相符性,为该类桥梁的检测与评估提供理论依据。During the section from Changchun to Siping in the reconstruction and extension project of Beijing - Harbin Expressway, to effectively control the differential settlement between new bridge and old bridge, the post grouting technique behind pile tip shall be used in cast - in - situ bored pile foundation of widening bridge. The construction technological controlling measures of pile tip post grouting, construction controlling essentials and technological process are explained and the characteristics of pile tip post grouting technique are summarized.
分 类 号:U446.1[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28