“十二五”期间在贵州东部建设火电电源对贵州电网投资的影响及可行性分析  

Analysis on the investment influence and feasibility to construct thermal power supply in Eastern Guizhou during "the Twelfth Five-Year Plan" of Guizhou Power Grid

在线阅读下载全文

作  者:马冲[1] 钟以林[1] 

机构地区:[1]贵州电网公司电网规划研究中心,贵州贵阳550002

出  处:《贵州电力技术》2014年第2期5-10,91,共7页Guizhou Electric Power Technology

摘  要:根据贵州"十二五"输电网规划,从电网的角度讨论了将"十二五"期规划火电电源从贵州西部迁移到东部建设这一思路的必要性和可行性,并举例论证了该思路在降低电网建设投资方面的作用。最后,从电厂角度简要分析了在贵州东部建设火电厂的经济可行性。According to the planning for Guizhou power grid during "The Twelfth Five - Year Plan" , from the point of power grid, This paper discussed and the feasibility and the necessity to remove the hermal power supply form Western Guizhou to Eastern Guizhou, and proved the function of idea to reduce power grid construction investment. Finally, the economic feasibility of thermal power plant construction in Eastern Guizhou was analyzed from the point of power grid.

关 键 词:火电电源 投资 经济可行性 

分 类 号:TM7[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象