黄花寨水电站建设关键技术问题  

Key technical problems in construction of Huanghuazhai Hydropower Station

在线阅读下载全文

作  者:赵其兴[1] 

机构地区:[1]中国水利水电科学研究院结构材料研究所,北京100038

出  处:《水利水电技术》2014年第1期90-95,共6页Water Resources and Hydropower Engineering

摘  要:介绍了黄花寨水电站建设取得的工程经验以及在一些关键技术问题上取得的突破。黄花寨水电站大坝为碾压混凝土双曲拱坝,最大坝高110 m,所处地层为摆佐组硅质灰岩,岩性为硬质岩,但内部却发育有不均匀分布的囊状风化带,地表和地下岩溶极为发育。在精心勘察和设计的基础上,将碾压混凝土和外掺氧化镁混凝土两种技术结合,仅采取简易温控措施并设置4条缝,实现了通仓碾压和快速筑坝,满足了高拱坝建设的需要。The engineering experiences acquired and the breakthroughs of some key technical problems obtained from the construction of Huanghuazhai Hydropower Station are described herein.The dam of Huanghuazhai Hydropower Station is a roller compacted concrete double curvature arch dam with the maximum height of 1 10m and located on the stratum of siliceous limestone of Baizuo formation with the lithology of hard rock consisting of some sack-like weathered zones unevenly distributed and developed inside,while both the surface and underground karst are well-developed therein.On the basis of elaborative investigation and design,the target of the whole-block rolling-compaction of concrete and quick construction of the dam is realized with the combination of both MgO concrete technology and RCC technology through the simplified temperature measures with a fewer contraction joints ; which not only satisfies the demand of the construction of the high arch dam,but also provides some references for the similar project concerned in the days to come.

关 键 词:强岩溶 硅质灰岩 囊状风化带 氧化镁碾压混凝土 黄花寨水电站 

分 类 号:TV743[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象