检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国建筑第二工程局有限公司,北京100054
出 处:《建筑技术》2014年第2期129-131,共3页Architecture Technology
摘 要:大连中心·裕景(公建)ST2塔楼工程采用了内爬式塔式起重机施工技术。经计算剪力墙承载力无法满足塔式起重机爬升要求,须对其进行加固。根据结构设计特点,确定了塔式起重机布置位置及相应的结构加固措施,较好地完成了施工任务,为类似工程提供参考。Interior climbing tower crane construction technique is adopted in the Eton Place-Dalian (public building) ST2 tower project. After calculation, it is found that the bearing capacity of the shear wall fails to meet the climbing requirements of tower crane and the shear wall must be reinforced. Based on the characteristics of structural design, position of tower crane and relevant structural reinforcement measures are determined and engineering construction is successfully completed, providing valuable references for similar projects in the future.
分 类 号:TU745.1[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.91.183