内爬升塔式起重机爬升施工工艺  被引量:4

CLIMBING CONSTRUCTION TECHNIQUE OF INTERIOR CLIMBING TOWER CRANE

在线阅读下载全文

作  者:刘勇[1] 高立为 王长磊[1] 

机构地区:[1]中国建筑第二工程局有限公司,北京100054

出  处:《建筑技术》2014年第2期129-131,共3页Architecture Technology

摘  要:大连中心·裕景(公建)ST2塔楼工程采用了内爬式塔式起重机施工技术。经计算剪力墙承载力无法满足塔式起重机爬升要求,须对其进行加固。根据结构设计特点,确定了塔式起重机布置位置及相应的结构加固措施,较好地完成了施工任务,为类似工程提供参考。Interior climbing tower crane construction technique is adopted in the Eton Place-Dalian (public building) ST2 tower project. After calculation, it is found that the bearing capacity of the shear wall fails to meet the climbing requirements of tower crane and the shear wall must be reinforced. Based on the characteristics of structural design, position of tower crane and relevant structural reinforcement measures are determined and engineering construction is successfully completed, providing valuable references for similar projects in the future.

关 键 词:超高层建筑 钢结构 内爬塔式起重机 爬升 加固 

分 类 号:TU745.1[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象