检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周云川[1]
出 处:《建筑技术》2014年第2期161-164,共4页Architecture Technology
摘 要:某游泳馆钢结构施工在场地受限制,作业环境差的情况下,合理安排了钢筋混凝土结构和钢结构的施工顺序,利用大型起重机起吊小型起重机解决吊装工作面问题,利用在钢梁上铺装铝锌压型钢板代替高架支模问题,并在钢构件加工制作和安全管理上采取了有效措施,保证了工程既定目标的实现。In a swimming pool steel structure project, the construction site is limited and working conditions are poor. The expected engineering objectives are successfully realized through reasonable arrangement of construction sequences of reinforced concrete structure and steel structure, using heavy crane to lift small one, replacing overhead formwork with aluminium-zinc steel plate on steel beam, as well as effective measures for processing, manufacturing and safety management of steel members.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28