检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国地质大学(北京)工程技术学院,北京100083 [2]中石化石油工程技术服务有限公司,北京100101
出 处:《科技导报》2014年第3期29-33,共5页Science & Technology Review
基 金:国家科技重大专项项目(2008ZX05031)
摘 要:沥青层安全钻井问题困扰Y油田的开发,微小的钻井液柱压力波动即可引起沥青流动侵入井内而发生复杂事故或弃井。分析表明,污染后钻井液性能恶化快、沥青易黏附固相颗粒、高温可流动性好、钻井液与沥青的置换型漏失等造成钻井液柱压力难以控制,进而造成沥青侵入速度与程度得不到有效控制。室内和现场试验表明,保持钻井液膨润土含量1%、随钻堵漏材料含量8%左右有利于钻进时钻井液柱压力控制;稠化封堵技术可减慢停止循环时的沥青侵入速度;控压钻井(MPD)技术可有效调控井筒液柱压力,以较低钻井液密度钻穿沥青层,降低沥青与钻井液置换量、侵入速度与程度到可控水平。The exploration of Y oilfield seriously sufibred from safety problems in the bitumen zone. Slight fluctuation of low drilling fluid pressure may trigger tile mobilization and invasion of near-wellbore bitumen, which may lead to complex accidents or well abandonment. Analysis indicated that it is hard to control the drilling fluid pressure because properties of bitumen-contaminated drilling fluid quickly got worse. Bitmnen has good liquidity at high temperature and adhered solid particles easily. Ewm worse, displacement loss of drilling fluid and bitumen accelerated invasion of bi|umen. Thus. the degree and speed of bitumen invasion got out of hand. Test resuhs in lab and field showed that, in order to control drilling fluid pressure, the contents of benlouite and plugging malerials at about 1% and 8% respeelively in drilling fluid are entcial while drilling. Meanwhile. invasion speed of bitumen can be reduced by thickening and plugging teehnology during eireulation stop. The nmnaged pressure drilling (MPD) technology can be used to effectively control wellbore drilling fluid pressure and drill through bitumen formation with lower drilling fluid density. Then the displacemenl amounl of bitumen and drilling fluid, invasion degree and speed were reduced to a "eontrolable" level.
分 类 号:TE254[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49