大朝山水电站碾压混凝土设计和施工的几个特点  被引量:1

Some Characteristics in Design and Construction of RCC in Dachaoshan Hydropower Station

在线阅读下载全文

作  者:林可冀[1] 邓毅国[1] 

机构地区:[1]国家电力公司北京勘测设计研究院,北京市100024

出  处:《水利水电技术》2000年第11期12-14,共3页Water Resources and Hydropower Engineering

摘  要:大朝山水电站碾压混凝土掺合料采用新型 PT掺合料 ;拦河坝为全断面碾压混凝土 ,河床坝段的碾压混凝土采用斜层平推铺筑法施工 ;大坝上游为全断面碾压混凝土双曲拱围堰 ,下游为碾压混凝土护面的土石过水围堰 ;溢流坝面为碾压混凝土台阶式溢流面 .其中拱围堰和土石过水围堰已经过三个汛期的过流考验 .现场的各种检测资料证明 ,大坝碾压混凝土质量优良 .大朝山水电站的实践证明 。In Dachaoshan Hydropower Station ,the new PT admixtures are used. The dam is RCC dam. The pouring layers are slanting in the RCC construction of river bed dam section. It is RCC double-curvature cofferdam in the upstream of dam ,and the cofferdam in downstream is earth and rock overflow cofferdam. The spillway face are RCC benched spillway face. These cofferdams were tested for three flood seasons. It is proved from inspecting data that the RCC is of high quality. It is shown from the application of Dachaoshan Hydropower Station Dam RCC that the RCC could be widely applied in water project construction .

关 键 词:大朝山水电站 碾压混凝土 设计 施工 

分 类 号:TV431.1[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象