检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国家电力公司北京勘测设计研究院,北京市100024
出 处:《水利水电技术》2000年第11期12-14,共3页Water Resources and Hydropower Engineering
摘 要:大朝山水电站碾压混凝土掺合料采用新型 PT掺合料 ;拦河坝为全断面碾压混凝土 ,河床坝段的碾压混凝土采用斜层平推铺筑法施工 ;大坝上游为全断面碾压混凝土双曲拱围堰 ,下游为碾压混凝土护面的土石过水围堰 ;溢流坝面为碾压混凝土台阶式溢流面 .其中拱围堰和土石过水围堰已经过三个汛期的过流考验 .现场的各种检测资料证明 ,大坝碾压混凝土质量优良 .大朝山水电站的实践证明 。In Dachaoshan Hydropower Station ,the new PT admixtures are used. The dam is RCC dam. The pouring layers are slanting in the RCC construction of river bed dam section. It is RCC double-curvature cofferdam in the upstream of dam ,and the cofferdam in downstream is earth and rock overflow cofferdam. The spillway face are RCC benched spillway face. These cofferdams were tested for three flood seasons. It is proved from inspecting data that the RCC is of high quality. It is shown from the application of Dachaoshan Hydropower Station Dam RCC that the RCC could be widely applied in water project construction .
分 类 号:TV431.1[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.19.120.1