破碎围岩矿体预控顶分段空场嗣后充填法的研究与实践  被引量:19

Study and Application on Precontrolling of Roof and Sublevel Open-stope Mining with Subsequent Filling Method for Fractured Surrounding Rock

在线阅读下载全文

作  者:李安平 刘洋树 皇甫风成 周明 

机构地区:[1]新疆阿舍勒铜业股份有限公司,新疆哈巴河县836700

出  处:《矿业研究与开发》2014年第1期1-3,15,共4页Mining Research and Development

摘  要:针对阿舍勒铜矿650m中段破碎围岩矿体,采用分段崩矿阶段空场嗣后充填采矿法采场发生垮塌的状况,提出了预控顶分段空场嗣后充填法开采的技术方案。7个采场的回采实践表明:该采矿方法适合阿舍勒铜矿上盘围岩破碎矿体的开采技术条件,并具有采场稳定性好、作业安全、贫化损失率低、生产能力大、综合经济效益高等突出优点,采场实际损失率为4%~5.7%、贫化率为3.3%~10.9%。To solve the problem that the fractured surround- ing rock at 650 meters in Ashele Copper mine collapsed with sublevel blasting and bench open-stope mining with subse- quent filling method, a new precontrolling of roof and sub- level open-stope mining with subsequent filling method was proposed. Practical results in 7 stopes showed that this min- ing method was suitable for mining condition here, with many advantages such as excellent stability in stope, operat- ing safety, low loss and dilution rates, high capacity and good economic benefits, ect. The actual loss rate was 4%~5.7%, and the dilution rate was 3.3%~10.9%.

关 键 词:破碎围岩 预控顶 分段空场采矿法 嗣后充填 

分 类 号:TD853.3[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象