检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邱敏[1] 鹿宁[1] 鲍呈苍[1] 周邠鹏[1] 赵靖伟[1]
机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065
出 处:《西北水电》2014年第1期44-48,共5页Northwest Hydropower
摘 要:深覆盖层的坝基设计是工程设计的难点。多布水电站河床式厂房位于河床深厚覆盖层上,地基承载力较低,变形沉降问题突出。根据厂房整体稳定及基础应力计算成果,完建工况时基础承载力富裕量很小。为提高地基承载力,减小沉降变形,设计采用混凝土灌注桩、旋喷桩等多种措施进行基础处理。计算表明,经处理后复合地基承载力满足设计要求,设计采用的基础处理方案是安全、合理、可行的。The design of the dam foundation in the deep overburden is the difficulty in the engineering design. The run-of-the-river pow- erhouse of Duobu Hydropower Project is seated on the deep and thick overburden on the riverbed, the bearing capacity of its foundation is lower and the deformation settlement is outstanding. In accordance with calculation of the integrated powerhouse stability and foundation stress, the margin of the bearing capacity of the powerhouse foundation is limited when the powerhouse is completed. To improve the bear- ing capacity of the powerhouse foundation and decrease the settlement deformation, the foundation is treated by such measures as applica- tion of concrete berehole pile, jet grouting pile, etc in design. The calculation shows that the bearing capacity of the composite foundation ( after being treated) satisfies the design requirement. Scheme for the foundation treatment applied by the designer is safe, reasonable and feasible.
分 类 号:TV223.22[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.51