中州氢氧化铝焙烧车间人工挖孔灌注桩设计  

Design of Artificial Digging Piles in Zhongzhou Aluminium Hydroxide Roasting Workshop

在线阅读下载全文

作  者:贾茹[1] 

机构地区:[1]沈阳铝镁设计研究院,辽宁沈阳110001

出  处:《有色矿冶》2000年第6期57-61,共5页Non-Ferrous Mining and Metallurgy

摘  要:在铝工艺中 ,当设备布置集中 ,厂房高差较大 ,而地基又较复杂时 ,应正确确定地基基础方案 ,使其满足土建自身的强度、稳定要求 ,又符合工艺生产要求。通过中州铝厂焙烧车间的基础设计及试验 ,总结了适合该地区特点的基础形式 ,为后期工程应用提供了科学、可靠的依据。In aluminium technology,equipments are sometimes placed closely of concerntrated,the difference of elevation of the workshop is very large,and the ground base is very complicated.Proper plans for the design of the foundation shall be made to meet the demand of the technology.The author of this article has summarized foundation according to the design and the test of the roasting workshop in Zhongzhou Aluminium Factory,which will provide sientific and reliable basis for the engineering later.

关 键 词:地基方案 桩基设计 人工挖孔灌注桩 桩基测试 

分 类 号:TU473.14[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象