上海轨道交通明珠线二期工程的总体设计  被引量:2

The Overall Design of the Second Phase Project of Shanghai Pearl Line

在线阅读下载全文

作  者:俞加康[1] 沈秀芳[1] 

机构地区:[1]上海市隧道工程轨道交通设计研究院

出  处:《地下工程与隧道》2000年第4期2-11,63,共10页Underground Engineering and Tunnels

摘  要:概述上海已建和正在筹建的城市轨道交通线。通过介绍明珠线二期工程建设的必要性、线路走向、客流预测、公交配套、行车组织、共线运营、车站与换乘以及车辆、机电设备的优化设计和国产化,阐述了我院承担设计总体的体会和今后搞好设计总体方向。This paper summarizes the finished and under construction urban rail transit lines in Shanghai, and introduces the necessity, circuit layout,passenger movement forecast, public transport complement, vehicle organization, collineation operatipn, stations and interchange stations, vehicle and electromechanical equipment optimum design and homemade of the second phase project of Shanghai pearl line, and expounds the realization of overall design. (12)The Intelligent Forecast and Control of Deep Excavation Deformation Sun Jun et al.Using nerves network and fuzzy control theory, this paper established a set of intelligent deformation forecast and control system of excavation, and developed a convenient opera-tion software successfully. The study has been proved feasibility and correction through real project.

关 键 词:轨道交通 明珠线 上海 二期工程 总体设计 

分 类 号:U239.5[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象