复杂地质综采工作面矿压规律监测与分析  被引量:5

Monitoring and Analysis on Mine Strata Pressure Law of Fully Mechanized Coal Mining Face with Complicated Geology

在线阅读下载全文

作  者:于保宽 李希建[1,2] 仇模伟[1,2] 王冠[1,2] 

机构地区:[1]贵州大学矿业学院,贵州贵阳550003 [2]贵州大学瓦斯灾害防治与煤层气开发研究所,贵州贵阳550003

出  处:《煤炭工程》2014年第2期79-81,共3页Coal Engineering

基  金:贵州省科技厅工业攻关项目(黔科合GY字(2011)3012号)

摘  要:五轮山煤矿1801工作面为矿井的第一个综采工作面,研究其顶板的矿压规律对开采过程中的顶板管理显得尤为重要。通过现场的仪器监测,结合矿山压力与岩层控制理论,对五轮山煤矿1801综放工作面回采期间矿压规律进行观测分析。得出了1801工作面回采期间的矿压显现规律和支架的载荷分布特点;来压期间,根据超前支承压力的观测,确定工作面超前支护的距离是50m。As the first fully mechanized coal mining face in Wulunshan coal mine, research on the rock pressure behavior of the roof was very important to the roof management in mining process. Based on in - situ instrument monitoring, and combining with theories of rock pressure and strata control, the rock pressure law during the exploitation of No. 1801 fully mechanized top - coal caving face was analyzed. The rock pressure behavior law and load distribution characteristics of the support during the exploitation of 1801 face were obtained. According to the observation of the advance abutment pressure during the face weighting, the forepoling distance was determined to be 50m.

关 键 词:复杂地质 综采工作面 矿压显现 煤与瓦斯突出 

分 类 号:TD322[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象