检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于保宽 李希建[1,2] 仇模伟[1,2] 王冠[1,2]
机构地区:[1]贵州大学矿业学院,贵州贵阳550003 [2]贵州大学瓦斯灾害防治与煤层气开发研究所,贵州贵阳550003
出 处:《煤炭工程》2014年第2期79-81,共3页Coal Engineering
基 金:贵州省科技厅工业攻关项目(黔科合GY字(2011)3012号)
摘 要:五轮山煤矿1801工作面为矿井的第一个综采工作面,研究其顶板的矿压规律对开采过程中的顶板管理显得尤为重要。通过现场的仪器监测,结合矿山压力与岩层控制理论,对五轮山煤矿1801综放工作面回采期间矿压规律进行观测分析。得出了1801工作面回采期间的矿压显现规律和支架的载荷分布特点;来压期间,根据超前支承压力的观测,确定工作面超前支护的距离是50m。As the first fully mechanized coal mining face in Wulunshan coal mine, research on the rock pressure behavior of the roof was very important to the roof management in mining process. Based on in - situ instrument monitoring, and combining with theories of rock pressure and strata control, the rock pressure law during the exploitation of No. 1801 fully mechanized top - coal caving face was analyzed. The rock pressure behavior law and load distribution characteristics of the support during the exploitation of 1801 face were obtained. According to the observation of the advance abutment pressure during the face weighting, the forepoling distance was determined to be 50m.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.215.45