检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁隧道集团有限公司专用设备中心,河南洛阳471009
出 处:《隧道建设》2014年第2期173-177,共5页Tunnel Construction
摘 要:为解决盾构法施工中盾构主驱动减速机失效问题,以北京市海淀区500 kV电力隧道工程为依托,结合以往盾构主驱动减速机修复经验,从主电机同步性、故障减速机解体、保险轴断裂及掘进参数等方面进行研究。得到盾构主驱动减速机失效的原因有:1)掘进参数不合理;2)二、三级减速机构滚动轴承失效。可为今后盾构法施工及减速机故障处理提供良好的决策依据。In this paper, the causes for the failure of the main drive reducer of shield machines are studied in terms of synchronism of electric motor, disassembly of damaged reducer, break of safety axis and boring parameters of shield machine, with the shield machine for the 500 kV power tunnel in Haidian District in Beijing as an example. The main causes for the failure of the main drive reducer of the shield machine are as follows : 1 ) Irrational boring parameters ; 2) Failure of rolling bearing of the 2nd grade and the tertiary reducers. The paper can provide reference for shield boring and reducer failure treatment in the future.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222