无裂缝大坝混凝土施工若干关键工艺  被引量:1

Several Key Processes of Non-cracked Concrete Dam Construction

在线阅读下载全文

作  者:王博[1,2] 周厚贵[1,3] 孙昌忠 杨富瀛 

机构地区:[1]河海大学水利水电学院,江苏南京210098 [2]中国葛洲坝集团股份有限公司三峡分公司,湖北宜昌443002 [3]中国能源建设集团有限公司,北京100029

出  处:《水力发电》2014年第3期40-42,78,共4页Water Power

基  金:中国葛洲坝集团股份有限公司三峡分公司科研资助项目(2013KJ-01)

摘  要:在三峡工程三期大坝混凝土施工过程中,在混凝土配合比持续优选、骨料冷却、下料与浇筑、振捣、养护、均匀快速上升、冷却及保温等多个方面创造了一套特有的施工技术和工艺。总结了无裂缝大坝混凝土施工的若干关键工艺,完善了我国混凝土施工质量控制技术体系,为混凝土坝的高质量快速施工,创造无裂缝大坝奠定基础。A set of specific construction technologies and processes is created after continuous improvement and detailed studies from all aspects of construction in the third phase construction of TGP, which including continuous mix proportion optimization, aggregate cooling, feeding and pouring, vibrating, curing, uniform rapid rise, cooling and insulation of concrete. Some critical construction processes of non-cracked concrete dam are summarized. These construction processes improve the quality control technology system of concrete construction in China, and the application of this technologies is conducive to the high-quality and rapid concrete construction of non-cracked dam.

关 键 词:无裂缝大坝 混凝土施工 工艺 质量控制 三峡工程 

分 类 号:TV544[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象