引黄入晋工程第三系红黏土特性与工程处理措施  

Engineering Features and Treatment Measures on Tertiary Red Clay of Yellow River Diversion Project(North Main)

在线阅读下载全文

作  者:程向民[1] 张劲[1] 

机构地区:[1]中水北方勘测设计研究有限责任公司

出  处:《水利水电工程设计》2014年第1期10-12,56,共3页Design of Water Resources & Hydroelectric Engineering

摘  要:上第三系红黏土地层,其工程性质复杂,组成物质和相变较大,在实际开挖施工过程中,N_2红黏土隧洞易发生塌方和大变形,严重影响隧洞掘进和围岩稳定。通过对引黄入晋工程的上第三系红黏土的结构、构造及工程性质研究,分析其变形及破坏的特征,对围岩变形及塌方洞段提出了合理的工程处理措施,效果较为显著,可作为类似工程设计和施工的参考。The Tertiary red clay stratum is complicated in engineering properties and great in phase change.In the course of actual excavation,N2 red clay tunnel is prone to collapse and large deformation which seriously affects the tunneling and stability of surrounding rock.By studying the structure,construction and engineering properties of the Tertiary red clay of the Yellow River Diversion Project,and analyzing the deformation and failure characteristics,treatment measures are put forward to the deformed and collapsed tunnel section and the results are obvious which can be used as reference for design and construction of similar projects.

关 键 词:引黄入晋工程 第三系红黏土 工程地质特性 施工措施 

分 类 号:TV223[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象