检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张士杰[1] 王志红[1] 刘澜文[1] 张左强[1]
机构地区:[1]中水北方勘测设计研究有限责任公司
出 处:《水利水电工程设计》2014年第1期35-38,共4页Design of Water Resources & Hydroelectric Engineering
摘 要:山西省万家寨引黄工程是目前我国已建运行在含沙水流扬程最高、装机容量最大以及年运行时间最长的大型远距离跨流域梯级调水工程。其中,北干线部分线路总长约156 km,沿线包括平鲁地下泵站及多座调节水库。主要针对北干线工程的运行特点和要求,对平鲁泵站及各调节水库主要机电设备的设计进行综合介绍,供今后其它调水工程设计参考。Wanjiazhai Yellow River Diversion Project is a large-scaled long distance inter-basin water transfer project characterized by the highest sediment flow lift,maximum installed capacity and longest annual running time in China.In which the North Main is about 156 km long including Pinglu underground pumping station and several regulating reservoirs.This text introduces the electrical and mechanical equipment design of the Pinglu pumping station and the regulating reservoirs according to the operation characteristics and requirements of the North Main,which can provide reference for other water diversion projects in future design.
分 类 号:TV68[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.118