引黄入晋工程北干线机电设计综述  

General Electrical and Mechanical Design of Yellow River Diversion Project(North Main)

在线阅读下载全文

作  者:张士杰[1] 王志红[1] 刘澜文[1] 张左强[1] 

机构地区:[1]中水北方勘测设计研究有限责任公司

出  处:《水利水电工程设计》2014年第1期35-38,共4页Design of Water Resources & Hydroelectric Engineering

摘  要:山西省万家寨引黄工程是目前我国已建运行在含沙水流扬程最高、装机容量最大以及年运行时间最长的大型远距离跨流域梯级调水工程。其中,北干线部分线路总长约156 km,沿线包括平鲁地下泵站及多座调节水库。主要针对北干线工程的运行特点和要求,对平鲁泵站及各调节水库主要机电设备的设计进行综合介绍,供今后其它调水工程设计参考。Wanjiazhai Yellow River Diversion Project is a large-scaled long distance inter-basin water transfer project characterized by the highest sediment flow lift,maximum installed capacity and longest annual running time in China.In which the North Main is about 156 km long including Pinglu underground pumping station and several regulating reservoirs.This text introduces the electrical and mechanical equipment design of the Pinglu pumping station and the regulating reservoirs according to the operation characteristics and requirements of the North Main,which can provide reference for other water diversion projects in future design.

关 键 词:引黄入晋工程 北干线 泵站 水库 机电设备 

分 类 号:TV68[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象