检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]兖矿集团有限公司济宁二号煤矿,山东济宁272072
出 处:《煤矿现代化》2014年第1期35-37,共3页Coal Mine Modernization
摘 要:济宁二号煤矿153上01工作面为十五采区首采工作面,工作面回采中直接顶垮落步距,老顶初次来压步距无同采区参照,在掌握工作面直接顶、老顶厚度及岩性的条件下,本文主要阐述工作面回采前,利用板模型和梁模型对直接顶垮落步距、老顶初次来压步距进行计算,推算出直接顶、老顶初次步距,有利于在工作面直接顶垮落及老顶初次来压前做好预测预报工作,确保来压期间的安全。No. two Jining coal mine 15301 working face fifteen mining area of first mining face, mining face of immediate roof caving step dis-tance, roof first weighting step without the same area reference, immediate roof, in mastering the working face roof thickness and lithology con-ditions, this paper mainly expounds the work face before, on the immediate roof caving step distance, roof first weighting step distance is cal-culated by plate model and beam model, calculated the direct roof, roof first step, is advantageous in the face of immediate roof caving and roof first weighting is done before the forecast work, ensure that the pressure period the safe.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15