检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]白银有色集团股份有限公司西北铅锌冶炼厂,甘肃白银730900
出 处:《甘肃冶金》2014年第1期43-46,共4页Gansu Metallurgy
摘 要:本文根据生产实践,以分析系统含锰变化时锌湿法生产情况为出发点,指出高锰时短期应采取降低酸锌比同时配合减少锰粉加入量的技术措施,长远应考虑如何解决老电解锌厂系统内累积杂质有效开路的问题,并结合锌浸出渣二次洗涤前后杂质变化,总结系统锰的平衡。Based on the production practice of zinc hydrometallurgy production , Through analyzing the change of manga-nese-bearing zinc hydrometallurgy process , it is pointed out in the high manganese condition that short-term measures should be taken to reduce acid zinc ratio with the reduction of manganese powder at the same time , and in the long run measures should be taken to solve the problem of effective open circuit for accumulated impurities from old electrolytic zinc plant system .Combined with change in the impurities in zinc leaching residues during the second washing , the balance of manganese in system was summarized .
分 类 号:TF813[冶金工程—有色金属冶金]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28