检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西北电力设计院,陕西西安710075 [2]西安建筑科技大学,陕西西安710054
出 处:《电力勘测设计》2014年第1期38-40,62,共4页Electric Power Survey & Design
摘 要:电厂主厂房是一个涉及多专业、多工种,情况错综复杂、多因素交织的大型工业厂房,与十几个专业密切相关,各种管道、设备、构件、电缆、复杂水平和垂直交通、检修和运行通道等交汇于此,还有众多功能要求、防护要求和检修维护运营要求等,充分利用BIM技术能更好并高效地解决各方面的设计和协同等问题,也为主厂房运行和管理的全生命周期提供可能和条件。Main block in power plant is a big factory building that involves multiple specialized fields, very complicated condition, and various factors, which is closely related to a dozen majors, like machine, civil, architecture and so on. It is an intersection of pipes, equipment, structural members, cable, traffic in horizontal and vertical, as well as the passage of maintenance and operation. Further the main block must meet the requirements of different functions, specific shelter, and maintenance. Hence BIM is introduced here to better solve the design and cooperation problems of main block, and it will also make the full life circle running and management of power plant feasible.
分 类 号:TU271[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229