检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曾二贤[1] 包永忠[1] 杨景胜[1] 高斐略[1]
出 处:《电力勘测设计》2014年第1期46-51,76,共7页Electric Power Survey & Design
摘 要:环境保护在输电线路工程中的重要性日益突出,本文研究并总结了山区输电线路环保设计的若干理念,主要结论如下:优化铁塔长短腿的极差设计,为基础配置和选用提供更大的空间;因地制宜选择性地设计特殊的塔型(如小根开铁塔、跳线上绕塔、Z型边坡塔、三角形断面塔等),可满足山区工程实际需要;优先选用原状土基础和新型环保基础型式;长短腿与不等高基础配合塔脚架使用可最大限度减少开方,建设性提出了几种适宜的塔脚架方案;山区塔基边坡推荐优先采用生态或综合护坡方案。It is increasingly of great importance of environmental protection in transmission line project. Some Environment favoring design decepts and its protection measures are presented in this paper, including:①optimal design of unequal tower-leg is useful for tower foundation design and configure;②special design of tower type(small-base-tower, Jumper upward-strained tower, z-shape tower and triangle section tower. etc) is carry out to meet the project requirements;③the undisturbed soil foundtion and new environment favoring type should preferably be applied;④the compound technique between unequal tower leg and piers with leg-trusses are constructively put up, to minimize the earthwork project; ⑤ecological treatment for tower-foundation-slope is recommended by the above analysis.
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.88