检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]吉林大学建设工程学院,吉林长春130026 [2]武汉立诚岩土工程有限公司,湖北武汉430074
出 处:《西部探矿工程》2014年第4期74-77,共4页West-China Exploration Engineering
摘 要:以某尾矿库为实例,分析尾矿的沉积规律和尾矿坝的稳定性。假定地下水流网为简单方格型,坝体为均质,针对坝体堆积现状标高和设计终期标高,分别考虑正常运行和洪水运行2种工况,用瑞典圆弧法和简化Bishop法分别进行稳定性计算。根据计算成果分析危险滑弧的分布规律和2种方法所得安全系数的差异。指出为了得出准确的计算结果,需要全面收集资料,建立符合实际的模型,采用合理的计算参数,进行现场浸润线和孔隙水压力监测。Taking a tailings pond as an example, the sedimentary feature of tailings and the stability of tailings dam are analyzed. As- suming that groundwater flow is simple grid and the dam is homo- geneous, considering both different working condition of in nor- mal operating and in flood, stability of the present accumulation height and designed final height is calculated by using Swedish cir- cular arc method and simplified Bishop method. According to the calculation results, dangerous slide arc distribution rules and the differences between the two safety factors are analyzed. Pointed out that in order to get accurate results, it is necessary to collect comprehensive data, establish more realistic model, adopt more reasonable calculation parameters, and monitor the seepage line and pore water pressure.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28