基于Copula函数的洞庭湖流域水沙丰枯遭遇频率分析  被引量:17

Copula-based Probability Evaluation of Rich-Poor Runoff and Sediment Encounter in Dongting Lake Basin

在线阅读下载全文

作  者:周念清[1] 赵露[1] 沈新平[2] 

机构地区:[1]同济大学水利工程系,上海200092 [2]湖南省洞庭湖水利工程管理局,湖南长沙410007

出  处:《地理科学》2014年第2期242-248,共7页Scientia Geographica Sinica

基  金:国家自然科学基金(41272249);博士点专项基金(20110072110020)资助

摘  要:受人类活动的影响,水沙灾害事件相继发生,对人们的生产、生活造成了威胁。以洞庭湖流域代表性水文站的年径流量和年输沙量系列数据为基础,应用P-III型曲线分别拟合并求得"松滋口、太平口、藕池口"三口入湖、"湘江、资江、沅水、澧水"四水入湖和城陵矶站出湖年径流量、年输沙量的边缘分布函数,再采用水文事件遭遇分析中广泛应用的Copula函数,建立洞庭湖流域水沙联合分布模型,分析洞庭湖流域水沙丰枯遭遇频率。研究结果表明洞庭湖三口、四水和城陵矶站的水沙丰枯遭遇频率关系与洞庭湖流域的水沙运动有密切联系,运用该水沙耦合模型可以为洞庭湖流域防洪减灾提供重要的理论依据。Under the influences of human activities, the successive water and sediment disasters posed threats on people's production and life. Based on the series data of annual runoff and sediment of representative hydro- metric stations in Dongting Lake Basin, P-III distribution curve is applied to fit the marginal distribution of an- nual runoff and sediment of 3 inlets (Songzikou, Taipingkou, Ouchikou), four rivers (Xiangjiang River, Zijiang River, Yuanjiang River and Lishui River) (entering the lake) and Chenglingji (coming out of the lake). The ap- plication of popular Copula-constructed two-dimensional joint distribution of runoff and sediment was illustrat- ed, and the joint distribution was used to calculate the encounter probability of rich-poor runoff and sediment in Dongting Lake Basin. Result shows that 1) Synchronous frequency of the runoff and sediment in 3 inlets is far more than asynchronous frequency, and the frequencies of rich water-rich sediment, poor water-poor sedi- ment and normal water-normal sediment are equal basically. 2) Synchronous frequency of the runoff and sedi- ment in four rivers and Chenglingji approximately equals asynchronous frequency, and the frequency of rich water-rich sediment is the highest in synchronous frequency, the frequency of poor water-poor sediment ranks the second, and the frequency of normal water-normal sediment is the lowest. 3) The frequency of the encoun- ter of opposite status of runoff and sediment (the frequency of rich water-poor sediment and the frequency of poor water-rich sediment) is the lowest of the asynchronous frequencies of rich-poor runoff and sediment en- counters in Chenglingji, 3 inlets and 4 rivers. The research results show that the model posses good evaluating performance and reveals a close contact with the basic characteristics of the runoff and sediment in Dongting Lake. With the analysis of the rich-poor runoff and sediment encounter probability, the frequency of water-sedi- ment disasters can be understanding qua

关 键 词:COPULA函数 水沙关系 丰枯遭遇频率 洞庭湖流域 

分 类 号:TV882.9[水利工程—水利水电工程] TV145

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象