检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:江明新
出 处:《红水河》2014年第1期65-69,共5页Hongshui River
摘 要:西津水电站自建库以来,由于河道的采砂、沿河工程建设、洪水等作用,库区河床地形及库容曲线均发生了变化,通过对库区固定断面地形的复测分析河床的演变并修正库容曲线。Since the reservoir of Xijin hydropower station has been put into operation, the riverbed topography and the storage-capacity curve were changed due to river sand mining, the project construction along the river, and the effects of floods etc. The riverbed evolution was analyzed and the storage-capacity curve was corrected through resurveying the fixed section topography of reservoir area.
分 类 号:TV145.1[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46