朱集西矿副井南等候硐室底鼓发生机理及其控制  被引量:2

Floor Heave Mechanism and Control of South Waiting Chamber in Auxiliary Shaft of Zhujixi Coal Mine

在线阅读下载全文

作  者:刘光程[1] 邹久群[2] 屈施展[2] 

机构地区:[1]淮南职业技术学院,安徽淮南232001 [2]安徽理工大学土木建筑学院,安徽淮南232001

出  处:《煤矿安全》2014年第3期50-52,56,共4页Safety in Coal Mines

基  金:安徽省优秀青年人才基金资助项目(2012SQRL257)

摘  要:为了控制深井软岩巷道中底臌发生,针对朱集西矿副井南等候硐室发生的严重底臌现象,分析其发生机理,得出软岩的物理、水理力学性质、地质环境及巷道底板支护强度等是巷道发生底臌的主要原因。提出采用先浅注浆后深锚注的修补施工方案,后期监测巷道底板60 d左右底帮收敛速率明显变缓,90 d左右底板压力趋于稳定,结果表明该工艺能够有效控制深井软岩巷道的底鼓发生。For controlling the floor heave in deep soft rock roadway, the paper analyzes the serious floor heave mechanism of the waiting chamber in Zhujixi Coal Mine, the physical and water management mechanical properties of soft rock and the roadway floor supporting strength are the main factors of floor heave. So, the design adopts shallow grouting the first step, and then adopts bolt - grouting rein- forcement. The deformation of mine became slow after 60 days monitoring, and the pressure of floor became stable. So, the results in- dicate that this process could control the occurrence of floor heave in soft rock surrounding roadway.

关 键 词:深井软岩 围岩破碎 高地应力 底臌 锚注加固 

分 类 号:TD327.3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象