检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国农村水利水电》2014年第3期120-122,共3页China Rural Water and Hydropower
摘 要:厄瓜多尔Coca Codo Sinclair(简称CCS水电站)500kV主变压器由于运输限制采用单相式,电压等级高,布置难度大,加之机电设计采用美国和IEC标准,并按国际惯例实行第三方咨询审查制度,其设计中存在许多特殊技术问题,仅针对主变布置、高压套管引出方式及防火防爆等特殊问题进行总结介绍,供相关人士参考。Beacause of the transportation restriction, Ecuador Coca Codo Sinclair hydroelectric power plant (CCS for short) adopts the single phase 500kV main transformer. It is the high voltage level, and it is difficult to lay out. American and IEC stadard is used for mechanical and electrical design, and the third-part international consulting is carried out. So there are lots of special technical problems. This paper summarizes and introduces special problems, such as transformer layout, high voltage bushing leading mode, fire and explosion proof, and so on. Some interrelated people can refer to it.
关 键 词:单相变压器 搬运通道 高压套管引出方式 快速压力释放系统
分 类 号:TM622[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.22.194.224