连续钢箱梁加固横隔板的局部应力分析  

The Partial Stress Analysis of the Reinforced Cross Diaphragm of Continuous Steel-box Girder

在线阅读下载全文

作  者:邓良强[1] 张文秋[2] 钱栋栋 

机构地区:[1]北京建达道桥咨询有限公司,北京100015 [2]北京三磊建筑设计有限公司,北京100048 [3]中铁六局集团北京铁路建设有限公司,北京100036

出  处:《公路工程》2014年第1期232-234,255,共4页Highway Engineering

摘  要:以某工程项目钢箱梁铺装厚度调整为背景,分析桥面铺装调整后的钢箱梁横隔板在汽车荷载轮压作用下的应力状况,发现钢箱梁的二期恒载变化对钢箱梁的局部应力影响较大,已经不能满足结构的正常使用要求。因此对已加工成型的钢箱梁横隔板进行加固,经过分析,加固后的横隔板应力满足使用要求,其分析结果与处理方法可供同类钢箱梁横隔板设计参考。on the background of the change about the thickness of steel-box girder’s pavement, according to analyze the stress of the cross diaphragm which acted by the vehicle load wheel press,indi-cate that pavement change have a big influence on the partial stress of the cross diaphragm,conclude that the cross diaphragm can’t meet the normal.The cross diaphragm which have been molding was rein-forced,the stress analysis about the cross diaphragm indicate that the cross diaphragm work well.The conclusions and measures can be used in the design for the similar bridge.

关 键 词:钢箱梁 铺装调整 横隔板 局部应力 横隔板加固 

分 类 号:U441.5[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象