检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水利水电科学研究院,北京100038 [2]环境保护部环境工程评估中心,北京100012
出 处:《中国水利》2014年第6期46-48,共3页China Water Resources
摘 要:随着大型水利水电工程不断建设,建设单位、环境影响评价单位、环境保护行政主管部门等对"三通一平"建设内容存在不同理解,导致出现部分工程未批先建、违规建设等问题,"三通一平"环境影响问题日益引起环境保护主管部门高度关注。针对大型水利水电工程"三通一平"、主要环境影响和环境管理中存在的问题,提出相应的建议和对策。During the development of hydropower stations or large dams, environmental impact of "land cleaning and road, electricity and water supply system construction" has attracted more attention from the environment administration department, as prior construction without authorization or illegal construction have been found in many project due to disagreement between constructor, people in-charge-of environment impact analysis and environment administrative department for the interpretation of its contents. Recommendations are raised regarding to the management for "land eleaning and road, electricity and water supply system construction".
分 类 号:TV72[水利工程—水利水电工程] X820.3[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.51.100