检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江勘测规划设计研究院枢纽设计处,湖北武汉430010
出 处:《人民长江》2014年第6期27-30,34,共5页Yangtze River
基 金:"十一五"国家科技支撑计划项目(2006BAB04A05)
摘 要:湍河渡槽是南水北调中线关键控制性工程之一,针对其长度大、流量大的特点,设计首先确定了槽身布置方式、渡槽长度及跨度,然后选定了双向预应力梁式渡槽为其结构形式。详述了渡槽结构计算分析结果和1∶1模型试验过程。分析表明,渡槽结构的计算方法选用基本正确,其计算结果与模型试验结果基本一致,槽身基本处于全受压状态,工作状态良好。介绍了造槽机的施工方案及布置情况。The Tuanhe aqueduct is a key controlling project in Middle Route Project of South-to-North Water Diversion. According to its characters of long distance and large flow, the engineers firstly determine its length, layout and span, then the structural formation of double pre-stressed beam aqueduct is proposed. The structural calculation results and 1:1 model test process are presented in detail. The results show that mechanics calculation method adopted is basically correct and the calcula-tion results are in agreement with the model test, in which the aqueduct body is in compression state in general and in good work-ing situation. Finally, the construction scheme and layout using aqueduct fabrication machine is presented.
关 键 词:梁式渡槽 造槽机 1∶1模型试验 南水北调中线工程
分 类 号:TV67[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229