深基坑“SMW”工法桩施工监理控制实践——以苏州科技城科技孵化器二期(致远国际商务大厦)工程为例  被引量:1

Supervision Control on SMW Process Pile Construction in Deep Foundation Pit ——Taking the Second Stage Project of Science and Technology Incubator In Suzhou Science City( Zhiyuan International Business Building) as an Example

在线阅读下载全文

作  者:汪祖民[1] 

机构地区:[1]苏州科技学院环境与教育研究中心,江苏苏州215011

出  处:《地矿测绘》2014年第1期19-22,共4页Surveying and Mapping of Geology and Mineral Resources

摘  要:"SMW"工法是作为一项推广应用的新技术。采用这种工法进行深基坑施工,可以实现基坑安全信息化施工。为此,从施工监理的角度,提出了施工前、施工准备阶段和施工过程中监理的主要内容。针对其施工作业各个阶段的不同特点,发现施工容易出现的一些问题,提出了有效的解决方案。The SMW method is promoted as a new technology. The safety information construction can be realized with this method for deep foundation pit construction. For this reason, from the perspective of construction supervision, the main content of construction supervision before construction, during construction preparation stage and during construc- tion is presented. Aimed at the different characteristics of the different stages during construction , we find that some problems are easy to crop up, and meanwhile an effective solution is presented.

关 键 词:深基坑围护 SMW工法 预应力锚桩 监理控制 

分 类 号:TU753[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象