检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]引滦局大黑汀水库管理处,河北迁西064300
出 处:《北京测绘》2014年第2期75-80,共6页Beijing Surveying and Mapping
摘 要:土石方断面测量工程中,主要的工作是绘制横断面图,计算断面积,计算工程量。传统的手工处理方法既费时费力,不易修改,且绘图精度和成果准确性难以保证。针对手工处理方法的问题和不足,利用Visual Basic 6.0编程语言开发了"土石方断面测量工程量计算系统"。轻松实现断面数据的输入、修改、查询、删除等操作,系统根据断面数据自动生成断面图、计算横断面积和工程量,断面图及工程量成果可以方便的输出、打印或保存。Earthwork section survey project, the main task is to draw cross section map, calculated area, engineering quan- tity calculation. Traditional manual method is time--consuming and laborious, not easy to modify, and the accuracy is dif- ficult to guarantee the accuracy and results of drawing. Aiming at the problems and shortcomings of manual processing method, using Visual Basic 6 programming language developed "earthwork section measurement engineering calculation system". Easily cross section data input, modify, query, delete operation, system according to the section data generation section, calculating the cross--sectional area and the volume of work, the measurement results, sections and engineering can be output, print or save.
分 类 号:P258[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15