摘  要:糯扎渡水电站首台机组投产初期,若厂用电按照原设计方案运行,则厂用电运行风险较大,可靠性不高,为保证机组长周期安全稳定运行,需提高厂用电运行可靠性。本文通过对多种运行方式进行的分析比较,选择了较为可靠的厂用电运行方式。During the early period of the commissioning of the first hydro-generating unit in Nuozhadu Hydropower Station, the operation of the auxiliary power has a large risk with lower reliability, if it is operated in accordance with the original design scheme. Thus, the reliability of the operation of the auxiliary power must be enhanced. Through the comparative analysis made on several operation modes, the more reliable operation mode of the auxiliary power is selected herein.

关 键 词:厂用电 备投方式 运行方式 糯扎渡水电站 

分 类 号:TV223.31[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象