检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《建筑科学与工程学报》2014年第1期36-43,共8页Journal of Architecture and Civil Engineering
基 金:"十一五"国家科技支撑计划项目(2006BAJ03A07-04)
摘 要:从隔震角度出发,探讨了隔震措施能否提高某一典型的通信机房走线架结构的抗震性能,在其设备楼板与承重支架间设置铅芯橡胶支座进行隔震处理,利用ANSYS有限元程序对其进行动力时程分析。结果表明:结构第1阶振型的自振周期由2.33s延长至3.59s,有效避开了场地卓越周期;走线架上部在地震作用下的相对变形大幅降低(降幅为58.5%);结构顶部加速度响应及基底地震剪力都有一定程度的减弱(降幅分别为10.4%,36.4%);对走线架结构的隔震处理能够有效提高其抗震性能,隔震措施切实可行。Basing on the seismic isolation ,seismic isolation technology was taken into account to improve the seismic performance of the cable tray structure for a typical communication room . Taking advantage of seismic isolation technology by setting rubber seismic isolation bears between equipment floor and bearing member .Based on ANSYS finite element software , the dynamic time history analysis was carried out .The results show that the self-vibration period of the first vibration mode is from 2 .33 s to 3 .59 s ,w hich avoids the site predominant period effectively .The relative deformation of cable tray structures on top decreases obviously (the reduction of 58 .5% ) .T he acceleration responses at the top of cable tray and the base shear get a certain degree of decrease(the reduction of 10 .4% and 36 .4% ,respectively) .By adopting seismic isolation technology ,the seismic performance of the construction of cable tray structures can be improved and certain effects have achieved through seismic isolation .
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.9