检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交公路规划设计院有限公司,北京100088 [2]烟台大学土木工程学院,山东烟台264005
出 处:《交通标准化》2014年第7期76-78,共3页Communications Standardization
摘 要:复杂水文地质情况、苛刻的施工控制(工作面、环保等)条件使得深基坑支护日益成为复杂系统工程。结合跨纳潮河大桥工程的深基坑支护,对桥梁深基坑支护中,采用锁口钢管桩围堰和型钢内支撑相结合的方法进行施工方案及效果的介绍。实践表明,在复杂地质条件下,该支护方案稳定、可靠,锁口止水性能优异,可恢复性好。Abstract: Deep excavations tend to be complex systems engineering under complex hydrological/geologi- cal conditions as well as rigor construction requirements such as working face, environment protection, etc. This paper illustrated the application of locking steel pipe pile cofferdam and section steel struts in re- taining and protection for Na-ehao River bridge deep excavations. It showed that this scheme is stable, re- liable, and has good water-locking function and recoverability as well.
关 键 词:锁口钢管桩围堰 复杂地质条件 深基坑支护 施工方案
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.56