浅议某大型循环水泵房施工方案的设计  被引量:1

A large circulating water pump room construction plan design research

在线阅读下载全文

作  者:袁建德 袁圆 

机构地区:[1]湖南省电力勘测设计院,湖南长沙410007

出  处:《中国科技信息》2014年第8期111-113,共3页China Science and Technology Information

摘  要:长沙电厂大型循环水泵房设计施工方案的选择,直接影响到湘江流大堤与周围居民的环境与安全。该文结合工程实际,对循环水泵房多种设计及施工方案进行分析、比较,从而解决了大型江边建筑物施工的安全、进度等问题。鉴于实际效果,该成果可在同类工程中应用。Changsha power plant circulating water pump room design and construction scheme selection, directly affect the flow of the xiangjiang river levee and environment and the safety of surrounding residents. In this paper, combining with the engineering practice, the circulating water pump house a variety of analysis and comparison are made on the design and construction plan, so as to solve the problems such as large river building construction safety, schedule. In view of the actual effect, the results can be applied in the similar projects.

关 键 词:循环水泵房 方案 比较 沉井 

分 类 号:TV54[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象