检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]内蒙古科技大学矿业工程学院,内蒙古包头014010 [2]内蒙古科技大学建筑与土木工程学院,内蒙古包头014010
出 处:《煤矿安全》2014年第4期201-203,共3页Safety in Coal Mines
摘 要:通过分析全留沟-搭桥、全留沟、半留沟各自的特点,从技术和经济上对3种内排土场留沟方案进行比选,得出需要修筑1条连接首采区东端帮与内排土场东部的运输道路,即采用全留沟-搭桥措施,来缩短卡车运距,降低运输成本,减少电铲的二次剥离量,提高作业效率。综上,从技术经济角度建议采用全留沟-搭桥方案,确保黑岱沟露天煤矿转向顺利进行。This article analyzes the characteristics among whole left ditch - bridge, whole left ditch and half left ditch, compares these three kinds of schemes for leaving a ditch in inner dump from technical and economic aspects. That needs to build a transportation road which connects the eastern end of the first mining area with inner dump, which adopts whole left ditch - bridge measure to shorten the length of haul truck and to reduce transportation costs and the secondary stripping quantity to improve the working efficiency. In conclu- sion, it advices to use the solution of whole left ditch - bridge from technical and economic angle to make sure Heidaigou Open - pit op- erate smoothly.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28