检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]石家庄铁道大学国防交通研究所,河北石家庄050043
出 处:《石家庄铁道大学学报(自然科学版)》2014年第1期60-63,共4页Journal of Shijiazhuang Tiedao University(Natural Science Edition)
摘 要:销连接是现代钢结构连接常用的形式,然而销孔与销轴之间不可避免地存在间隙。利用ANSYS软件研究销孔间隙对耳板孔壁承压容许应力的影响。在弹塑性阶段,通过详细的数值分析以塑性区面积为"桥梁"研究了销孔间隙对耳板孔壁承压建议容许应力的影响。将得到的离散数据进行解析拟合,给出了耳板承压建议容许应力随销孔间隙变化的公式。Pin connection is commonly used m modem steel structure connection, however, mete *~ an u,- evitable clearance between the pin shaft and the pin hole. This paper studies the pin hole clearance effects on the ear plate hole wall allowable bearing stress by ANSYS software. In the plastic stage, the pin hole clearance effects on the plate hole bearing allowable stress is studied with the the plastic area as "bridge" and through de- tailed numerical analyses. The discrete data are fitted to obtain a formula about the plate bearing allowable stress with the pin hole clearance.
分 类 号:U445.3[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117