检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长安大学环境科学与工程学院,陕西西安710054 [2]西安市政设计研究院有限公司,陕西西安710068
出 处:《供水技术》2014年第2期33-36,共4页Water Technology
摘 要:长距离高扬程输水管道水锤防护难度大,极易造成运行事故。根据长距离高扬程输水管道系统的特点并结合西北地区某县长距离输水工程,采用多级加压、各级泵站之间独立计算的方法,讨论了此类工程水锤防护方法,可为同类工程提供参考。The water hammer control was difficult in long-distance and high-lift water transmission pipeline, which caused operational accident easily. Combined the characteristics of long-distance and high-lift water transmission pipeline system with the long-distance water transmission project in a county in northwest area, the water hammer control method of this kind of project was discussed adopting multi- stage pressurization and independently calculation method between pump stations. It could provide reference for similar engineering project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.224.21.26