地震液化区某电厂冷却塔地基处理设计方案优化比选分析  

Scheme Comparison Analysis of Foundation Treatment for the Cooling Tower of one Fossil-fired Power Plant in Earthquake Liquefacient Region

在线阅读下载全文

作  者:黄刚[1] 陈朝[1] 吴国庆 

机构地区:[1]国家核电技术公司国核电力规划设计研究院,北京100095 [2]中交路桥技术有限公司,北京100029

出  处:《特种结构》2014年第1期88-90,共3页Special Structures

摘  要:火力发电厂冷却塔对地基的承载力要求较高,在天然地基承载力或变形不能满足上部结构要求时,一般要采用人工方法对地基进行强化处理。本文结合工程地质及现场效果,通过技术经济分析了地震液化区不同的地基处理方案,综合认为振冲碎石桩复合地基比钻孔灌注桩经济,技术上更为优化。Cooling tower for fossil-fired power plant have a high requirement of ground bearing capacity. When the bearing capacity of natural foundation or its distortion can not meet our design's request, a ground treatment usually can be taken to strengthen it. According to the engineering geology and the field effect ,this paper introduces the different schemes for strengthening the earthquake liquefacient country foundation from the aspect of technical economy. The results show that the vibro-replacement stone column is better than the driven cast-in-place pile from the aspect of technology and economy.

关 键 词:冷却塔 地基承载力 碎石振冲桩 液化区 

分 类 号:TU472[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象