台阶式消能工在金平水电站的应用  被引量:2

Application of the Terraced Energy Dissipater in Jinping Hydropower Station

在线阅读下载全文

作  者:姜华[1] 陈永清[1] 

机构地区:[1]中南勘测设计研究院宜昌设计院,湖北宜昌443002

出  处:《水电与新能源》2014年第3期17-19,共3页Hydropower and New Energy

摘  要:主要介绍了金平水电站竖井溢洪道出口台阶消能方式、消能工的布置及运行情况,阐述了台阶式消能工的消能原理及消能率,结合水工模型试验成果及实际泄洪情况对金平台阶消能进行了总结,结果表明:台阶消能工消能率在80%以上,台阶上不发生空蚀,大大减轻了下游消能压力。The terraced energy dissipater behind the outlet of the shaft spillway in Jinping Hydropower Station and its layout and the operation status are introduced. Energy dissipation principles and the dissipation ratio of the terraced dis- sipater is presented. Results of the hydraulic model experiment and the actual performance of the Jinping terraced energy dissipater show that the energy dissipation ratio of such dissipater is over 80% and cavitation is not observed on the dissi- pater steps, which relieves the pressure of downstream energy dissipation greatly.

关 键 词:金平水电站 台阶式消能工 消能原理 消能率 

分 类 号:TV653[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象