检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张栋[1]
机构地区:[1]中国水利水电第七工程局有限公司,四川眉山620860
出 处:《水电与新能源》2014年第3期66-68,共3页Hydropower and New Energy
摘 要:近年来国内山区风电工程中山越来越高,风机安装难度越来越大,如何在紧张的工期下安全高效的完成风机安装,是每个风电施工企业面临的主要课题。以河北坝上骆驼沟二期风电场为例,对山区风电工程特点和风机吊装技术进行总结分析,以期对更多山区风机安装提供借鉴。In recent years, mountains for domestic wind power development become higher, which also make the instal- lation of wind turbines a more difficult work. For wind power projects, it is now a major issue to complete the installation of wind turbines safely and efficiently on schedule. In this paper, practical experience from the second stage Luotuogou project in Hebei province is summarized. Characteristics of wind power projects in mountainous area and techniques for wind turbine installation are analyzed, which provide useful references to other wind turbine installation work in moun- tainous area.
分 类 号:TK83[动力工程及工程热物理—流体机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.11.120