检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网宁夏电力公司电力科学研究院,宁夏银川750011
出 处:《宁夏电力》2014年第1期1-6,11,共7页Ningxia Electric Power
基 金:国家电网公司科技项目(国网发展发[2013]170号)
摘 要:为应对规模化新能源接入电网面临的巨大挑战,通过对宁夏地区常规机组及新能源场站的深入研究,建立了常规电源的出力特性、调峰特性模型,并在考虑网架约束条件下,开发了适用于宁夏电网的新能源生产模拟系统,可用于量化评估新能源发电的接纳能力以及新能源规划的经济性。仿真结果验证了系统的有效性和先进性,可为新能源规划及调度运行部门提供技术支撑。In order to cope with the great challenge of large-scale new energy access power grid, the conventional unit model including output and peak regulation characteristics are set up through further research of conventional units and new energy stations for Ningxia area. New energy production simulation system is developed considering the grid constraint which can be used for quantitative evaluation of adaptability for new energy power genetration and economy of new energy planning. The simulation result shows that validity and advancement of the system can provide technical support for the planning and operation departments of new energy.
关 键 词:规模化 新能源场站 调峰特性 网架约束 生产模拟
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222